In July 2020 our first in-house domestic field trial system had completed 12 months of operation. The rural dwelling heating and DWH was converted from oil to 100% Electric. From the data collected over the period, the consumer made cost savings of £510 in YR1, and we estimate CO2 emissions more than halved. This will further demonstrate our technology, and system architecture as well as providing a valuable case study and data collection